Packages

Simple Construction Package Comparison For Easy Decision-Making.

This page helps you compare all 9 packages in simple English. You can quickly see the price, key materials, warranty, and what is included in each package.

Levels
9 package levels
Rate Range
₹1,899 to ₹3,449 / sq.ft.
Format
Easy comparison tables, cards, and FAQs
Package Ladder

All 9 Packages Shown As Simple Cards.

These cards give a simple package-by-package summary with price, warranty, reports, handover, and major inclusions before you move into the full comparison table. If you want the exact brand details for each package, open the Brand Schedule page from the matching card.

LS-1

Basic Build Package

₹1,899 / sq.ft.

A budget-friendly package with branded materials and proper structural design.

Structural warranty
2 years
Reporting
Available on request
Handover
Drawings, certificate, warranties
Retention / DLP
— / 6 months
ARS / iSTEEL / Viki / Suryadev / Tirumala / Pulkit reinforcement grade to approved structural design and MTC
Design-mix structural RCC to approved structural design
Foundation type and depth from site conditions and structural design
Flooring allowance ₹55 / sq.ft.; sanitaryware ₹16,000 per bathroom
Standard site QA with engineer-directed concrete testing
LS-2

Better Waterproofing Package

₹1,999 / sq.ft.

Adds better protection against water problems in the foundation, terrace, and outer walls.

Structural warranty
5 years
Reporting
Available on request
Handover
Same as LS-1
Retention / DLP
— / 6 months
Two-coat below-ground bituminous protection applied before backfilling
Terrace weathering course with waterproof coating
Waterproofing admixture in external plaster, balcony, and sunken slab coating
Flooring allowance ₹60 / sq.ft.; sanitaryware ₹19,000 per bathroom
Enhanced waterproofing inspection workflow
LS-3

Quality-Checked Structure Package

₹2,099 / sq.ft.

Includes lab-tested concrete quality checks and proper records.

Structural warranty
10 years
Reporting
Fortnightly with photos
Handover
Same as LS-2 + stage records
Retention / DLP
— / 6 months
Concrete cube testing at important stages, with lab certificates
Continuous lintel band to all walls; pre-construction anti-termite treatment
Two-coat below-ground bituminous protection before backfilling
Teak main door allowance ₹38,000; AC point in bedrooms
Flooring allowance ₹70 / sq.ft.; sanitaryware ₹23,000 per bathroom
LS-4

Long Warranty Structure Package

₹2,249 / sq.ft.

Gives a 15-year structural warranty with better material records and after-handover support.

Structural warranty
15 years
Reporting
Fortnightly with photos
Handover
Same as LS-3 + warranty file
Retention / DLP
— / 12 months
15-year structural warranty on footing, column, beams and roof slab
12-month post-handover support period
Better steel records and stronger wall specifications
Monolithic RCC staircase with granite ₹130 / sq.ft.
Flooring ₹80 / sq.ft.; sanitaryware ₹28,000 per bathroom
LS-5

Ready-Mix Quality Package

₹2,399 / sq.ft.

Uses ready-mix concrete with better quality checking and records.

Structural warranty
15 years
Reporting
Monthly written update
Handover
Same as LS-4 + test reports
Retention / DLP
— / 12 months
ARS / iSTEEL / SAIL / Vizag with steel records
Ready-mix structural concrete with plant batch records
Water-hold test done in every wet area before finishing work
Enhanced below-ground bituminous protection at junctions and penetrations
Flooring ₹95 / sq.ft.; sanitaryware ₹34,000 per bathroom
LS-6

Full Engineering Package

₹2,549 / sq.ft.

Includes the full engineering file with calculations, soil report, and quality records.

Structural warranty
15 years
Reporting
Monthly written update
Handover
Same as LS-5 + calculation report
Retention / DLP
₹25 / 12 months
Signed structural calculation report given to you
Full soil test report with bore details, lab results, and safe bearing capacity
Membrane terrace waterproofing with 10-year system warranty
Crack-control mesh, EV charging point, and safety trip protection on all power circuits
Flooring ₹110 / sq.ft.; sanitaryware ₹40,000 per bathroom
LS-7

Premium Strength Package

₹2,799 / sq.ft.

Built for better long-term strength, with more detailed design records given to you.

Structural warranty
15 years
Reporting
Monthly report and review
Handover
Same as LS-6 + design model file
Retention / DLP
₹25 / 12 months
High-density concrete with controlled water-cement ratio and ready-mix throughout
Structural design model file given to you
Stronger below-ground protection with extra care at joints and pipe entry points
Safer wiring, better circuit safety, CCTV points, LAN points, and video door phone
Flooring ₹135 / sq.ft.; sanitaryware ₹50,000 per bathroom
LS-8

Coastal Protection Package

₹3,099 / sq.ft.

Made for coastal or difficult sites where salt air, groundwater, or harsh site conditions are a concern.

Structural warranty
15 years
Reporting
Twice-monthly update and review
Handover
Same as LS-7 + durability records
Retention / DLP
₹25 / 12 months
CRS / premium steel plan where site exposure needs extra protection
Low-permeability concrete mix designed for exposed sites
Salt-check testing for aggregates and washed M-sand
Membrane below-ground protection where groundwater or salt exposure needs it
Flooring ₹150–160 / sq.ft. base allowance; sanitaryware ₹55,000 per bathroom
LS-9

Top Premium Life Package

₹3,449 / sq.ft.

Our top package with the strongest long-life planning and a dedicated site engineer.

Structural warranty
20 years
Reporting
Dedicated site engineer
Handover
Full final file with maintenance schedule
Retention / DLP
₹30 / sq.ft. / 24 months
20-year structural warranty; ₹30 / sq.ft. support retention; 24-month defect support period
Full below-ground protection system with membrane, joints, protection, and drainage layer
High-performance concrete designed for harsh exposure, with water-tightness checking
SS316 railings, marine-grade hardware, and rust-resistant fixings
Flooring ₹175–180 / sq.ft. base allowance; sanitaryware ₹60,500 per bathroom
Full 9-Package Comparison

Compare All 9 Packages In One Easy Table.

After the package cards, this full table lets you compare all 9 packages side by side by price, warranty, materials, finishes, and important features.

Main package comparison table

Each column starts with the package price, so it is easier to scan. The rows below show what changes from one package to the next.

On mobile, swipe this table sideways. The first column stays visible so you can track each row more easily.

SpecificationPrice₹1,899 / sq.ft.Price₹1,999 / sq.ft.Price₹2,099 / sq.ft.Price₹2,249 / sq.ft.Price₹2,399 / sq.ft.Price₹2,549 / sq.ft.Price₹2,799 / sq.ft.Price₹3,099 / sq.ft.Price₹3,449 / sq.ft.
Basic package details
Package nameBasic Build PackageBetter Waterproofing PackageQuality-Checked Structure PackageLong Warranty Structure PackageReady-Mix Quality PackageFull Engineering PackagePremium Strength PackageCoastal Protection PackageTop Premium Life Package
Core package promiseA budget-friendly package with branded materials and proper structural design.Adds better protection against water problems in the foundation, terrace, and outer walls.Includes lab-tested concrete quality checks and proper records.Gives a 15-year structural warranty with better material records and after-handover support.Uses ready-mix concrete with better quality checking and records.Includes the full engineering file with calculations, soil report, and quality records.Built for better long-term strength, with more detailed design records given to you.Made for coastal or difficult sites where salt air, groundwater, or harsh site conditions are a concern.Our top package with the strongest long-life planning and a dedicated site engineer.
Structural warranty2 years5 years10 years15 years15 years15 years15 years15 years20 years
Client reportingAvailable on requestAvailable on requestEvery 2 weeks with photosEvery 2 weeks with photosMonthly written updateMonthly written updateMonthly report and reviewTwice-monthly update and reviewDedicated site engineer
Handover documentationDrawings, certificate, warrantiesSame as LS-1Same as LS-2 + stage recordsSame as LS-3 + warranty fileSame as LS-4 + test reportsSame as LS-5 + calculation reportSame as LS-6 + design model fileSame as LS-7 + durability recordsFull final file + maintenance schedule
Support retention / defect support— / 6 mo— / 6 mo— / 6 mo— / 12 mo— / 12 mo₹25 / sq.ft. / 12 mo₹25 / sq.ft. / 12 mo₹25 / sq.ft. / 12 mo₹30 / sq.ft. / 24 mo
Material brands and finish levels
Steel brand levelARS / iSTEEL / Viki / Suryadev / Tirumala / PulkitARS / iSTEEL / Viki / Suryadev / Tirumala / PulkitARS / iSTEEL branded setARS / iSTEEL / SAIL / SuryadevARS / iSTEEL / SAIL / VizagARS / iSTEEL / SAIL / VizagARS / iSTEEL / SAIL / JSW / TataCRS / premium steel for exposed-site needsCRS / corrosion-protection plan with premium hardware
Electrical levelISI copper wiring with basic safety switchFire-resistant modular fittingsFire-resistant fittings + AC pointsFire-resistant fittings + wet-area safety switchFire-resistant fittings + extra safety switchExtra safety switch on all power lines + EV pointAdvanced safety switch + CCTV + LAN + video door phoneExtra safety switches + CCTV + video door phoneAutomation-ready electrical planning
Plumbing and bathroom levelCPVC plumbing, standard drainage, ₹16k sanitarywareApproved-brand plumbing, ₹19k sanitarywareApproved-brand plumbing, ₹23k sanitarywarePremium valves, ₹28k sanitarywarePremium plumbing brand, ₹34k sanitarywarePremium plumbing brand, ₹40k sanitarywareBetter water flow system, ₹50k sanitarywareBetter water flow + pressure control, ₹55k sanitarywareHigh-end plumbing layout, ₹60.5k sanitaryware
Flooring budget level₹55 flooring₹60 flooring₹70 flooring₹80 flooring₹95 flooring₹110 flooring₹135 flooring₹150–160 flooring base₹175–180 flooring base
Work quality and finish allowances
Wet-area waterproofingBasic bathroom waterproofingTwo waterproof coats with wall upturnTwo waterproof coats with wall upturnTwo waterproof coats with extra joint protectionWater-hold test recordedWater-hold test recordedWater-hold test recordedTwo-stage water-hold testTwo-stage water-hold test with salt check
Flooring allowance₹55₹60₹70₹80₹95₹110₹135₹150–160 base₹175–180 base
Sanitaryware per bathroom₹16,000₹19,000₹23,000₹28,000₹34,000₹40,000₹50,000₹55,000₹60,500
Electrical systemISI copper wiring with basic safety switchesSafer branded modular electrical fittingsSafer wiring with AC pointsSafer wiring with extra wet-area safetySafer wiring with extra safety protectionFull power-circuit safety with EV pointAdvanced safety with CCTV and LAN pointsAdvanced safety with CCTV and video door phoneWiring planned for home automation
Plumbing systemCPVC water lines and standard drainage systemSame system with approved brand materialsSame system with approved brand materialsPremium plumbing brand with better control valvesPremium plumbing brandPremium plumbing brandBetter water distribution systemBetter water distribution with pressure control where neededHigh-service plumbing layout with pressure control
Testing and quality checksRegular site checks and engineer-guided concrete testingRegular checks and better waterproofing inspectionConcrete testing plan with lab certificatesLab testing with stronger material recordsReady-mix batch records with quality recordsEngineering file with planned testing recordsExtra concrete checks when neededDurability checks focused on water resistanceDurability checks focused on water and salt resistance
Engineering and waterproofing level
Concrete quality levelSite-mixed concrete with measured batchingSite-mixed concrete with measured batchingMachine-mixed concrete with batch recordsMachine-mixed concrete with batch recordsReady-mix concrete at roof and plinthReady-mix concrete at footing and roofReady-mix concrete throughoutSpecial concrete mix for exposed sitesHigh-durability premium concrete mix
Structural recordsDesign on fileDesign on fileDesign on fileDesign summary issuedDesign summary issuedSigned calculation report givenCalculation report + design model givenCalculation report + design model givenFull calculation and durability file
Soil test recordsSite checkSite checkSite checkSite checkSite checkFull soil investigation includedFull soil investigation includedSoil investigation with site-based changes if neededDetailed soil investigation with full mapping
Below-ground protectionStandard DPC coating + plinth beamTwo-coat bituminousTwo-coat bituminousTwo-coat bituminousEnhanced junction detailEnhanced protection with membrane layerStronger protection systemProtection system designed for exposed sitesEngineered membrane protection system
Terrace waterproofingCement finishWeathering course + coatingWeathering course + coatingCoating + flood testCoating + flood testMembrane, 10-year warrantyMembrane + protection screedMembrane + cool roofEngineered membrane + cool roof
Main things included in each package
Key inclusion 1ARS / iSTEEL / Viki / Suryadev / Tirumala / Pulkit reinforcement grade to approved structural design and MTCTwo-coat below-ground bituminous protection applied before backfillingConcrete cube testing at important stages, with lab certificates15-year structural warranty on footing, column, beams and roof slabARS / iSTEEL / SAIL / Vizag with steel recordsSigned structural calculation report given to youHigh-density concrete with controlled water-cement ratio and ready-mix throughoutCRS / premium steel plan where site exposure needs extra protection20-year structural warranty; ₹30 / sq.ft. support retention; 24-month defect support period
Key inclusion 2Design-mix structural RCC to approved structural designTerrace weathering course with waterproof coatingContinuous lintel band to all walls; pre-construction anti-termite treatment12-month post-handover support periodReady-mix structural concrete with plant batch recordsFull soil test report with bore details, lab results, and safe bearing capacityStructural design model file given to youLow-permeability concrete mix designed for exposed sitesFull below-ground protection system with membrane, joints, protection, and drainage layer
Key inclusion 3Foundation type and depth from site conditions and structural designWaterproofing admixture in external plaster, balcony, and sunken slab coatingTwo-coat below-ground bituminous protection before backfillingBetter steel records and stronger wall specificationsWater-hold test done in every wet area before finishing workMembrane terrace waterproofing with 10-year system warrantyStronger below-ground protection with extra care at joints and pipe entry pointsSalt-check testing for aggregates and washed M-sandHigh-performance concrete designed for harsh exposure, with water-tightness checking
Key inclusion 4Flooring allowance ₹55 / sq.ft.; sanitaryware ₹16,000 per bathroomFlooring allowance ₹60 / sq.ft.; sanitaryware ₹19,000 per bathroomTeak main door allowance ₹38,000; AC point in bedroomsMonolithic RCC staircase with granite ₹130 / sq.ft.Enhanced below-ground bituminous protection at junctions and penetrationsCrack-control mesh, EV charging point, and safety trip protection on all power circuitsSafer wiring, better circuit safety, CCTV points, LAN points, and video door phoneMembrane below-ground protection where groundwater or salt exposure needs itSS316 railings, marine-grade hardware, and rust-resistant fixings
Key inclusion 5Standard site QA with engineer-directed concrete testingEnhanced waterproofing inspection workflowFlooring allowance ₹70 / sq.ft.; sanitaryware ₹23,000 per bathroomFlooring ₹80 / sq.ft.; sanitaryware ₹28,000 per bathroomFlooring ₹95 / sq.ft.; sanitaryware ₹34,000 per bathroomFlooring ₹110 / sq.ft.; sanitaryware ₹40,000 per bathroomFlooring ₹135 / sq.ft.; sanitaryware ₹50,000 per bathroomFlooring ₹150–160 / sq.ft. base allowance; sanitaryware ₹55,000 per bathroomFlooring ₹175–180 / sq.ft. base allowance; sanitaryware ₹60,500 per bathroom
Quick Compare

Start With The Main Differences.

If you want a quick summary first, check these points: warranty, reporting, handover documents, and defect period.

Quick package summary

This table shows the main differences without making you read every package card first.

On mobile, swipe this table sideways to compare all packages.

Specification₹1,899 / sq.ft.₹1,999 / sq.ft.₹2,099 / sq.ft.₹2,249 / sq.ft.₹2,399 / sq.ft.₹2,549 / sq.ft.₹2,799 / sq.ft.₹3,099 / sq.ft.₹3,449 / sq.ft.
Structural warranty2 years5 years10 years15 years15 years15 years15 years15 years20 years
Client reportingAvailable on requestAvailable on requestEvery 2 weeks with photosEvery 2 weeks with photosMonthly written updateMonthly written updateMonthly report and reviewTwice-monthly update and reviewDedicated site engineer
Handover documentationDrawings, certificate, warrantiesSame as LS-1Same as LS-2 + stage recordsSame as LS-3 + warranty fileSame as LS-4 + test reportsSame as LS-5 + calculation reportSame as LS-6 + design model fileSame as LS-7 + durability recordsFull final file + maintenance schedule
Support retention / defect support— / 6 mo— / 6 mo— / 6 mo— / 12 mo— / 12 mo₹25 / sq.ft. / 12 mo₹25 / sq.ft. / 12 mo₹25 / sq.ft. / 12 mo₹30 / sq.ft. / 24 mo
Technical Compare

Waterproofing, Finish Budget, Systems, And Quality Checks.

This section shows the practical differences between packages, like waterproofing, flooring budget, bathroom budget, electrical work, plumbing, and quality checks.

Finishes, systems, and quality checks

Use this table to see what really changes in the work quality, finish budget, and checking process.

On mobile, swipe this table sideways to compare all packages.

Specification₹1,899 / sq.ft.₹1,999 / sq.ft.₹2,099 / sq.ft.₹2,249 / sq.ft.₹2,399 / sq.ft.₹2,549 / sq.ft.₹2,799 / sq.ft.₹3,099 / sq.ft.₹3,449 / sq.ft.
Wet-area waterproofingBasic bathroom waterproofingTwo waterproof coats with wall upturnTwo waterproof coats with wall upturnTwo waterproof coats with extra joint protectionWater-hold test recordedWater-hold test recordedWater-hold test recordedTwo-stage water-hold testTwo-stage water-hold test with salt check
Flooring allowance₹55₹60₹70₹80₹95₹110₹135₹150–160 base₹175–180 base
Sanitaryware per bathroom₹16,000₹19,000₹23,000₹28,000₹34,000₹40,000₹50,000₹55,000₹60,500
Electrical systemISI copper wiring with basic safety switchesSafer branded modular electrical fittingsSafer wiring with AC pointsSafer wiring with extra wet-area safetySafer wiring with extra safety protectionFull power-circuit safety with EV pointAdvanced safety with CCTV and LAN pointsAdvanced safety with CCTV and video door phoneWiring planned for home automation
Plumbing systemCPVC water lines and standard drainage systemSame system with approved brand materialsSame system with approved brand materialsPremium plumbing brand with better control valvesPremium plumbing brandPremium plumbing brandBetter water distribution systemBetter water distribution with pressure control where neededHigh-service plumbing layout with pressure control
Testing and quality checksRegular site checks and engineer-guided concrete testingRegular checks and better waterproofing inspectionConcrete testing plan with lab certificatesLab testing with stronger material recordsReady-mix batch records with quality recordsEngineering file with planned testing recordsExtra concrete checks when neededDurability checks focused on water resistanceDurability checks focused on water and salt resistance

Engineering level

This table shows how the engineering side improves from one package to the next, including concrete quality, documents, foundation protection, and terrace waterproofing.

On mobile, swipe this table sideways to compare all packages.

Specification₹1,899 / sq.ft.₹1,999 / sq.ft.₹2,099 / sq.ft.₹2,249 / sq.ft.₹2,399 / sq.ft.₹2,549 / sq.ft.₹2,799 / sq.ft.₹3,099 / sq.ft.₹3,449 / sq.ft.
Concrete quality levelSite-mixed concrete with measured batchingSite-mixed concrete with measured batchingMachine-mixed concrete with batch recordsMachine-mixed concrete with batch recordsReady-mix concrete at roof and plinthReady-mix concrete at footing and roofReady-mix concrete throughoutSpecial concrete mix for exposed sitesHigh-durability premium concrete mix
Structural recordsDesign on fileDesign on fileDesign on fileDesign summary issuedDesign summary issuedSigned calculation report givenCalculation report + design model givenCalculation report + design model givenFull calculation and durability file
Soil test recordsSite checkSite checkSite checkSite checkSite checkFull soil investigation includedFull soil investigation includedSoil investigation with site-based changes if neededDetailed soil investigation with full mapping
Below-ground protectionStandard DPC coating + plinth beamTwo-coat bituminousTwo-coat bituminousTwo-coat bituminousEnhanced junction detailEnhanced protection with membrane layerStronger protection systemProtection system designed for exposed sitesEngineered membrane protection system
Terrace waterproofingCement finishWeathering course + coatingWeathering course + coatingCoating + flood testCoating + flood testMembrane, 10-year warrantyMembrane + protection screedMembrane + cool roofEngineered membrane + cool roof
Scope Boundary

What Is Included, What Depends On The Site, And What The Owner Must Handle.

This section shows what is inside the package, what is site-dependent, what is an upgrade, and where lower packages should not be used without stronger engineering.

A — Included in package price

These works are included in the package rate.

Architectural and structural design
Excavation, foundation and RCC structure
Masonry, plastering, waterproofing
Flooring, tiling, kitchen counter and dado
Doors, windows, joinery and metal works
Electrical and plumbing systems
Painting, testing, supervision and handover

B — Site and approval related works

These items usually depend on the site or approvals and are usually charged separately.

Rainwater harvesting structure
Underground sump and septic tank
Sewer, water and EB connections
Borewell and pump set
Plan approval and statutory fees
Abnormal foundation / piling / raft ground improvement
Rock excavation, dewatering and shoring
Compound wall, gate and external infrastructure

C — Optional upgrades

These are optional upgrades you can add if needed.

Modular kitchen, wardrobes and carpentry
False ceiling and TV units
Premium façade elements
Landscaping, paving and pergola
Lift, generator, solar and automation
Higher tile or sanitaryware allowance
Loose furniture, appliances and curtains

Owner responsibilities and approvals

Some things must be arranged by the owner or depend on the site, not on the package price alone.

Construction water and electricity
Space for material storage and labour rest
Land, title and boundary clarity
Access permissions from association or authority
Selection decisions within the agreed schedule dates
Payment of statutory fees at authority rates

Where lower packages should not be used

This helps you see where lower packages may not suit the site or the design requirement.

LS-1 and LS-2 are not for waterlogged or weak-soil plots where the foundation demand is higher.
LS-1 should not be used for coastal severe-exposure sites or harsh salt-air conditions.
Very narrow access plots, complex villas, large spans, cantilevers, double-height designs, and heavy façade/glazing needs should move to a higher package or a custom engineering quote.
If a premium brand requirement already starts above the package band, it should be treated as an upgrade, not assumed inside the lower package price.
Declining the wrong project protects both the client’s build and Lokra’s delivery record.

Foundation and soil basis before quoting

This explains how site condition changes the footing choice and extra-cost logic.

Firm inland strata with safe bearing capacity around 180 kN/m² or above — conventional isolated footing is included in the package rate.
Medium-firm sites with moderate water table — deeper or combined footing may be needed, with about 8% to 14% adjustment depending on design.
Loose sand or high water-table sites — design-specific foundation and groundwater pumping are extra, commonly about ₹100 to ₹175 per sq.ft. plus pumping if required.
Filled or reclaimed ground — raft, ground improvement, or piling is priced after the soil report and structural design.
Rock strata or abnormal excavation — controlled excavation is measured and quoted separately.
No fixed rate is issued for reclaimed land or high-exposure sites without a soil report.
Separately Priced / Additional Works

Extra Works And Extra Costs You Should Know About.

This section shows the common extra costs outside the package price, like water and drainage works, approvals, EB connection, compound wall, difficult excavation, demolition, neighbour protection, and foundation changes that depend on the soil report.

How the brand list works

A brand list is not the same as a brand promise to one specific item before procurement starts.

The agreement records the grade and the named product band, not just a company name.
If more than one approved brand is listed, Lokra chooses from that signed approved list during procurement.
A brand list is not a brand commitment to a single item before procurement starts.
If a named brand becomes genuinely unavailable, Lokra proposes an equivalent substitute only in writing and proceeds only after approval.
Tiles, granite, uPVC profiles, and glazing stay within the stated allowance and approved vendor list at material-selection stage.
Material invoices remain available for inspection during the project.

How to read an allowance

Allowances are not vague placeholders. They follow a clear rate, format, and difference-billing logic.

Tile and stone allowances are material basic rates per sq.ft.; GST, transport, loading, wastage, adhesive, grout, and skirting already sit inside the package and are not deducted from the allowance.
Sanitaryware and CP allowances are quoted per bathroom and scale with the house; for example, a three-bathroom home at LS-4 carries ₹84,000 total allowance.
Kitchen counter allowances carry both a rate and a running-foot limit. Length beyond that limit is charged at the same rate.
Tile allowance covers material within the stated rate and the standard laying format for that package. Oversized slab tiles, book-matched patterns, specialty cuts, levelling systems, epoxy, or non-standard laying methods can add installation charges.
Choosing material above the allowance means only the difference is billed. Choosing below the allowance is credited.
All allowances are confirmed against the approved vendor list during selection.

Water, drainage, approval, and utility works

These are common extra-cost items that are usually priced separately from the main package rate.

On mobile, swipe sideways if you want to see the full rate and specification together.

ItemSpecificationRate / Basis
Rainwater harvesting structureStatutory under Chennai byelaw; verify current requirement at approval stage₹18,000₹85,000 by specification
Underground sumpPer litre capacity₹28 per litre
Septic tank / bio tank / fire chambered tankPer litre₹16₹28 per litre
Soak pit3 ft dia × 5 ft depth₹18,000₹28,000
Borewell with pump setDepth dependent₹1,20,000₹2,50,000
Water softener / pressure pumpDomestic₹18,000₹90,000
CMDA / DTCP plan approvalWithin city limits₹50₹80 per sq.ft
CMWSSB sewer connection110 mm / 140 mm₹24,500 / ₹26,500
CMWSSB advance taxPer dwelling unit, where unassessed₹3,000
TNEB service connectionSingle or three phase, subject to TNEB sanction₹25,000₹45,000
Soil investigationBoreholes, tests, and report (included from LS-6)₹18,000₹25,000
Water-table / soil water-absorption testingFor difficult or exposed sites₹8,000₹15,000

Compound wall, site works, and difficult-site extra costs

These are common extra costs when the site or design needs more work than the standard package.

On mobile, swipe sideways if you want to see the full rate and specification together.

ItemSpecificationRate / Basis
Compound wall, basic4.5" solid block to sill₹700₹900 per running foot
Compound wall, standardWith 2 ft setback finish₹1,400₹1,800 per running foot
Compound wall, finishedWith elevation treatment₹2,300₹2,800 per running foot
M.S. gate, 15 ft₹30,000₹45,000
SS or designer gate, 15 ft₹60,000₹99,000
External paving and drivewayPer sq.ft₹120₹280
Lift shaft and site infrastructure where a lift is part of the designQuoted on the lift specificationQuoted on the lift specification
Piling / raft / ground improvementDecided after checking the soil reportQuoted after soil investigation
Rock excavation, soil replacement, dewateringBeyond normal excavationMeasured and quoted
Excess excavation and imported filling soilBeyond standard excavation and filling assumptionMeasured and quoted
Road cutting and restorationAuthority permission and reinstatementAt authority rates plus works
Below-ground bituminous coating at LS-1Two coats, measured on actual treated surface areaMeasured add-on, quoted on area

Access, demolition, and neighbour protection works

These items are often not visible in the main package rate, but they can increase cost and site difficulty.

On mobile, swipe sideways if you want to see the full rate and specification together.

ItemSpecificationRate / Basis
Existing building demolitionDismantling, debris removal and cart-awayMeasured and quoted
Neighbouring structure protectionSupport work for adjoining walls or buildingsQuoted based on design
Temporary shoring and earth retentionFor deep excavation or tight urban plotsQuoted based on design
Restricted-access material handlingManual shifting where machinery cannot reachQuoted after site check
Traffic and road occupancyAuthority permission, escort or night deliveryAt authority rates plus handling
Soil disposal beyond haul assumptionCart-away past the standard distancePer load, measured
Major tree removalWhere authority permission is applicableQuoted; statutory fee at actuals
Documentation, Hold Points & Handover

The Audit Trail Behind The Package — Not Just The Build Stages.

This section doesn’t just describe materials. It also shows the build sequence, checkpoints, records, testing, and handover quality, so you can understand how the package is managed and closed out.

Fifteen stages from agreement to keys

This section explains Lokra’s full delivery path, not just the material list, so homeowners can see what the engineering-and-execution flow looks like before handover.

Project initiation — agreement, brief confirmation, and engineering kick-off
Survey and engineering — total-station or setting-out survey, soil assessment, and structural design
Excavation and foundation preparation — marking, excavation, PCC, and founding-level check
Foundation RCC — footing reinforcement, pre-concrete check point, footing concrete, and columns
Sump and plinth — below-ground damp protection, backfilling in layers, and plinth beam
Ground floor structure — columns, masonry, lintels, sunshades, and staircase
Intermediate floor structure — slab shuttering, reinforcement, slab pour, and curing
Upper floor and roof structure — repeat of approved drawings, headroom, and parapet
Concealed electrical and plumbing works — electrical chasing, conduit, plumbing pipework, and pressure test
Masonry and plastering — pre-plaster inspection, internal plaster, and external plaster
Waterproofing and flooring — wet areas, terrace, water-hold tests, flooring, and tiling
Doors, windows, and metal works — frames, shutters, uPVC windows, grills, and railings
Painting and finishes — putty, primer, interior coat, and elevation finish
Fixtures, testing, and final checks — CP fittings, electrical fixtures, system tests, and final inspection
Inspection and handover — pending-fix list, correction, cleaning, walkthrough, keys, and file handover

Every package documentation trail

Approved architectural and structural drawings
Material and brand approvals against the agreement
Stage photographs at important check points
Concrete pouring and curing records
Cube test results
Plumbing pressure test and electrical test records
Pending-fix list and correction record
Handover certificate and warranty letter
Electrical board details and product warranty cards

Added at higher levels

Laboratory test certificates issued — LS-3 upward
Digital project file — LS-5 and above
Signed structural calculation report — LS-6 and above
Soil test report — LS-6 and above
Structural design model file — LS-7 and above
Durability records and exposed-site design basis — LS-8 and above
Full final file and maintenance schedule — LS-9

Foundation pre-pour

Footing location against setting-out
Excavation depth and founding condition
PCC level and dimensions
Footing dimensions and shuttering
Bar diameter, spacing and laps
Column starter position and verticality
Pre-pour photographs and engineer approval

Slab pre-pour

Formwork line, level, slab thickness and beam depth
Props, supports and joint tightness
Main and distribution reinforcement
Electrical conduits, fan boxes and sleeves
Approved grade, slump check and cube sampling
Pour record and curing regime logged

Pre-plaster and plumbing test

Wall alignment and plumb
Conduits and junction boxes
Plumbing lines and pressure-test status
Door frame fixing
Leakage inspection and rectification
Written approval recorded before concealment

Final checks, cleaning, and handover

Joint pre-handover inspection covering cracks, tile hollowness, alignment, doors, windows and locks, plumbing leakage and drainage, sanitary fixtures, electrical points and DB, paint, railings, façade and external drainage
A written list of pending fixes given to you, with an agreed correction plan
Rectification and joint re-inspection until the list is closed
System testing and commissioning — electrical circuits, water supply, drainage and fixtures
Full final cleaning of the house and the site
Client walkthrough with demonstration of services, valves, DB and maintenance points
Handover of keys, drawings, test records, warranties, and the full project file
FAQ

Common Questions Before Choosing A Package.

This page is designed to make the package comparison readable directly on the website. Final package fit should still be aligned to site condition, project intent, and budget band with Lokra Infra directly.

How should I choose the right Lokra package?

Start with your plot condition, budget comfort, and how much reporting, waterproofing, and long-term protection you want. Then compare warranty, quality checks, flooring allowance, bathroom allowance, and site-fit notes. If your plot has weak soil, groundwater, coastal exposure, or a more complex design, do not choose on price alone.

What is the easiest way to compare these packages?

Begin with the quick package ladder for the big picture, then check the full comparison table for the details that affect your actual build: structure, waterproofing, allowances, reporting, retention, and handover. The right package is the one that matches your site and delivery expectations, not just the lowest rate.

Which packages suit a normal inland plot, and which are better for difficult sites?

Lower and mid-range packages are better suited to normal inland plots with more straightforward site conditions. Higher packages are better when the project needs stronger waterproofing, more quality controls, better reporting, longer warranty expectations, or added protection for coastal, groundwater, or more demanding site conditions. Final fit should still be checked against the actual site.

What happens if my material choices are above the allowance?

Only the difference above the allowance is billed. If you choose below the allowance, the difference is credited. This helps you upgrade selectively without losing clarity on where the extra cost comes from.

Can I speak to Lokra Infra before choosing a package?

Yes. Share your plot location, project type, and budget direction through the contact form. Lokra Infra can help you shortlist the most suitable package before you commit, especially if your site has soil, access, exposure, or specification complexities.

Want Help Selecting The Right Package For Your Site?

Share your plot location, site condition, and budget range. Lokra Infra can help you shortlist the package that best fits your site and long-term needs.

Discuss My ProjectCall Lokra Infra
Chat with us